Advising Transgrid on the construction and long-term access agreements for the Snowy 2.0 Pumped Hydro project. This included the construction, commissioning of, and services to be delivered by, two new double-circuit transmission lines to connect Snowy 2.0 to Transgrid’s transmission network. 

Snowy 2.0 is Australia’s largest renewable energy project (for an extra 2000 MW of firm capacity) and represents an expansion to the existing Snowy Hydro Scheme.